97人妻互换精品全国视频,午夜亚洲色欲AV一区二区三区,在线亚洲午夜理论AV大片,日本高清无卡码一区二区久久

Contact Us

AC Fan after the installation is complete the note

Date: 2016-5-11   Click: 1492 Times

"AC Fan" after installation, flip a hand wheel, check whether tight or grazing to other sites. In the absence of exceptional circumstances, you can test run, the exposed part of the fan drive apparatus should be shielded, which in the "AC Fan" is not the whole package, user supplied, if the air inlet pipe is not connected, then, also need to add a protective cover. The fan is equipped with electronic control box must match the fan phase. In particular, note that, when the fan wiring, be sure to get a professional electrician wiring, the wiring must be correct and reliable, especially at the electrical control box terminal number must be consistent with the fan numbers on the fan after installation to check the entire installation the "AC Fan" living within the impeller is not a tool to pull down or other debris.

Back to: Industry news

+86-0769-83660708

Home Product News Contact

靖安县| 仪征市| 孝感市| 聂拉木县| 凌云县| 新乐市| 秦安县| 麻城市| 濉溪县| 乌兰察布市| 永州市| 夏邑县| 枞阳县| 禹州市| 万安县| 团风县| 潞西市| 拜城县| 孙吴县| 太仓市| 平南县| 贵溪市| 甘南县| 抚顺县| 囊谦县| 施甸县| 蕉岭县| 海安县| 渭源县| 浦北县| 孟村| 专栏| 栾川县| 镇雄县| 虎林市| 宁化县| 贵定县| 旬阳县| 崇明县| 定南县| 新野县|